🏠No image available

Building Materials

GSAReal Estate📍 Barberton, OH

Current Bid

No bids

Time Left

6d 10h

Ends Apr 30, 2026

Seller

🏛️ Defense Contract Management Agency - Local — Defense Contract Management Agency - Local

Condition: As-is

Description

One lot consists of Building Materials. 1. 1 in Cast Iron 90 Deg Elbow. (quantity 27) 2. 1.5 in Cast iron 90 Deg elbow. (quantity 1) 3. Threaded cast iron coupling used to join two sections of pipe. (quantity 4) 4. Cast iron reducing elbows used to transition from 1 in pipe to 0.5 in pipe at 90 degrees. (quantity 2) 5. Cast iron reduced coupling used to connect 1 in pipe to 0.5 in pipe. (quantity 1) 6. Steel pipe hanger ring used to suspend and support 1 in fire sprinkler piping. (quantity 31) 7. Steel pipe hanger ring used to suspend and support 1.5 in fire sprinkler piping. (quantity 17) 8. Steel pipe hanger ring used to suspend and support 2.5 in fire sprinkler piping. (quantity 210) 9. Threaded malleable iron pipe cap used to close the end of a 1 in pipe. (quantity 3) 10. Galvanized threaded pipe plug used to seal threaded pipe openings. (quantity 6) 11. Galvanized threaded steel pipe nipple used to connect two fittings. (quantity 6) 12. Schedule 40 threaded steel pipe nipple for fire sprinkler piping connections. (quantity 1) 13. Schedule 40 threaded steel pipe nipple for fire sprinkler piping connections. (quantity 9) 14. Schedule 40 threaded steel pipe nipple for fire sprinkler piping connections. (quantity 1) 15. Schedule 10 steel pipe used for fire sprinkler distribution piping systems. (quantity 754) 16. Stainless steel concrete anchors are used to secure threaded rods or supports to concrete. (quantity 258) 17. Steel all thread rods are used for hanging and supporting fire sprinkler piping systems. (quantity 634) Property Inspection: Bidders are strongly encouraged to inspect the property prior to placing a bid to evaluate its condition and suitability. By bidding without an inspection, bidders assume the risk of potential omissions in the description. Removal Responsibilities: The successful bidder is solely responsible for all aspects of removal, including packing, crating, banding, loading, and shipping. The agency will not provide assistance. Authorized Third-Party Removal: The authorized third-party agent must present a Letter of Authorization from the high bidder (see terms and conditions for details), a copy of the purchaser's receipt, and a valid photo ID at the time of removal. All quantities provided are estimates.

Pickup Information

📍
Barberton, OH 44203

Defense Contract Management Agency - Local — Defense Contract Management Agency - Local

📅Pickup within 15 business days
📝For all inquiries regarding property inspections, or removals, please contact: Darrel Goldman on (404) 229-6652 or via email darrel.goldman@gsa.gov. Bidders are strongly encouraged to inspect the property prior to placing a bid to evaluate its condition and suitability. By bidding without an inspection, bidder assumes the risk of potential omissions in the description.

Similar Auctions